Ambulance Depot WAST HART

Brynmenyn

""
The project consisted of the conversion of a former tile warehouse into office, training and storage facilities for the first HART base in Brynmenyn, Bridgend.

The project involved design and construction works of refurbishment and alterations to the existing fabric of the building. The works included demolition which involved removal of low grade ACMs, removal of existing internal partition walls, ceilings, Mezzanine floor areas, staircases and redundant services, replacement cladding to roof and wall areas, alterations to the existing structural steel frame to facilitate new windows, personnel doors, high bay roller shutters, and mechanical services.

External to the main building separate structures are constructed to house a fixed vehicle wheel wash bay, a covered vehicle parking bays including secure motor bike and cycle store with a refuse area and associated external works. This work included, for all mechanical installations, electrical installations, drainage works, trenching of electrical, gas and water services, entrance and exit ramps, with modifications to parking bays and footpaths on access route, service yard, fencing and local landscaping.

« Back to Health projects

Value £2M
Architect Holder Mathias
Surveyors Davies Langdon
Engineers RVW
Start Date 0000-00-00
Contract Period 20 weeks
Form of Contract JCT Design and Build 2011