MUSTANG MARINE DRY DOCK BUILdiNG
client - bdc contracts (mh) ltd
value - £1.5m
duration - 14.5 weeks
part of a local enterprise zone
Engineer - John Brailsford
Surveyor - Banks Wood
Construction of a new dry dock fabrication building for the maintenance and repair of working boats, pilot boats, passenger and commercial vessels.
The building is fitted with multiple overhead gantry cranes each of six-tonne capacity and suitable for continuous operation moving and positioning prefabricated boat sections, engines and machinery.