2016

Construction of a unique curved bridge, topped with timber decking, culptured cladding and feature lighting. The bridge’s piled foundations, concrete structure and 20-tonne steel sections were all placed via ‘jack-up’ barges and floating pontoons. Castle Bridge is an integral part of the Finzels Reach development, linking the Floating Harbour to the city centre. ICE ‘Designed in Wales 2018’ winner.