This contract involved stripping the natural vegetation off an area of fields and excavating in order to build a 6 million gallon reservoir. It was built on reinforced concrete foundations with mass concrete walls 26’ high and 11’ thick at the base tapering to a 2’ thickness at the top. The roof of the reservoir was a reinforced concrete slab supported on mushroom head columns. Finally, the natural vegetation was replaced over the structure, concealing the reservoir underground.