RAIL BRIDGE
client - associated british ports
value - £3M
duration - 16 weeks
live port environment
Award winning bridge
Engineer - Opus
Design and Build replacement 42-metre single-span rail bridge over the dry dock entrance to the River Usk.
The single span bridge is 5.2m wide, with composite steel and concrete main beams on piled foundations.
With associated earth retaining structures and piled abutments were all undertaken within a tidal estuary, the bridge carries a single railway line on a ballasted track.
WINNER: Institution of Chartered Engineers Roy Edwards Award