TAWE BARRAGE REPAIRS
client - city & council of swansea
value - £0.1m
duration - 9 weeks
framework contract
work 30ft below water level
The project is situated in the middle of Swansea Marina, alongside a swing bridge above the main lock.
Repair work to the barrage service tunnels include: concrete and joint repair, pavement set repair and work to large load test anchors.
Approx 125-metres in length the tunnels are used to run power cables and services to local residents and businesses in the Maritime Quarter.